DUNGA

Onshore oil treatment facility in Kazakhstan supporting field development and integration activities. The project included ICSS integration and operational support, ensuring system reliability and continuity of production within an evolving plant configuration.
AREA 1 MEXICO ICSS

Mexico Area 1 Development Phase II strengthened offshore power and communication infrastructure connecting 1 FPSO, 4 WHP platforms, and the onshore ORF facility. Composite submarine cables with optical fiber enabled reliable power distribution and data connectivity across the entire offshore production network.
NGUYA

Built at Wison’s shipyards in Nantong and Zhoushan, with final integration completed in Qidong, the Nguya FLNG was delivered to Eni in just 35 months from first steel cut, a fast-track benchmark for its class. Developed under a modular EPC strategy and powered by the efficient IPSMR® process, the unit has now achieved its first […]
NENE FIELD ICSS INTEGRATION

Within the Congo LNG integrated development, Key Solution played a central role in the EICT integration Engineering and Commissioning across offshore, FLNG, FPU, and onshore assets. In a highly interconnected and fast-track environment, we ensured operational coherence between platforms, Scarabeo 5 FPU, Tango and N’GUYA FLNG, OPT, and telecom networks. Through structured ICSS design, C&E […]
