Kashagan
Discovered in July 2000, Kashagan has been described as the largest field found in the past 40 years, the largest outside of the Middle East, with a projected output close to that of the Ghawar field in Saudi Arabia
Key Solution for Rosetti Marino Group
Commissioning, Startup, First Oil, Train 2 Development
January 2012 - December 2014
Kashagan Field is the offshore oil and gas field 80km south-east of Atyrau, in the north Caspian Sea.
Agip KCO, a local subsidiary of ENI, is responsible for developing and starting production at the field (Eni’s interest 16.81% in the consortium for exploitation).
Activities performed by Key Solution in Kashagan:
- Pressurization systems of pump houses and chemical skids;
- Temporary refuge pressurization system for safety emergency situations and evacuation in Hazardous environments,
- Wellhead control Panel for production and re-injection wells.
- Logic modification and dynamic test of B01 – PSA1 OIL EXPORT PUMP HOUSE HVAC
- Logic modification and dynamic test of B02 – PSA1 OIL BOOSTER PUMP HOUSE HVAC
- Logic modification and dynamic test of B03 – PUA COMPRESSOR BUILDING HVAC
- Logic modification and dynamic test of B04 – PUA CHEMICAL BUILDING HVAC
- Logic modification and dynamic test of B05 – PUA METHANOL BUILDING HVAC
- Logic modification and dynamic test of B06 – LSA WABAS BUILDING HVAC
- Logic modification and dynamic test of B07 – PSA2 OIL EXPORT PUMP HOUSE HVAC
- Logic modification and dynamic test of B08 – PSA2 OIL BOOSTER PUMP HOUSE HVAC
- Logic modification and dynamic test of B09-B10 – TEMPORARY REFUGE EMERGENCY
- BREATHING SYSTEM AND HVAC
- A-Island WELLHEAD CONTROL PANEL
- D-Island WELLHEAD CONTROL PANEL
- Provided full assistance and support in First Oil and startup phase working in highly hazardous environment and troubleshooting initial startup and cleanup of the wells with high H2S concentration.